Records · procedure · next step
Mining access: surface rights and occupation file
A mining-access file links the actual title and affected parcels to owners, surface operators and the proper consent or authority record. French statutory occupation differs from Vaud’s distinct surface-research and subsoil/concession refusal routes. Preserve plans, observations and supplied compensation evidence. This preparation does not convert the title into unrestricted entry, create a private easement, establish expropriation or calculate an affected owner’s loss.
General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Julie by AlphaDeep
Julie currently assists with French law. Which French occupation or surface-rights records would you like to organise?
3 free questions at signup. Avoid names and sensitive information.
Which title and works establish the actual scope?
France distinguishes mining operation, authorised exploration and PER work within their rules. Vaud distinguishes surface research from subsoil research or concession; preserve the real route.
Which parcels and perimeter are involved?
Link actual parcel plans to title limits and requested occupation. French outside-perimeter occupation carries its stated public-utility reservation; no additional area is inferred.
Prepare the records
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Synthetic example
Title, parcel, person, access, observation, authority and compensation matrix
- Title
- Synthetic T1, actual perimeter plan missing
- Parcels
- Masked parcels A/B, footprint V2 supplied
- Parties
- Owner P1, surface operator E1 to establish
- Access
- Actual consent/occupation route not assumed
- Observations
- O1 invitation, draft response V1
- Act
- A1 authority decision absent
- Compensation
- Supplied I1 assessment, payment/security unproved
- Changes
- Plan V2 to reconcile with actual acts
This record organises supplied documents and values; it certifies no entitlement, permission or safety.
Which French land exclusions need checking?
The cited occupation branch excludes land adjoining homes or enclosed by walls/equivalent fences, subject to its reservations. Identify the actual land without treating every parcel as available.
Who receives the French opportunity to comment?
Owners and, where applicable, surface operators must be able to submit observations before authorisation. Keep their actual status, notices, comments and responses.
What French compensation evidence precedes occupation?
The beneficiary must have paid or provided security for the assessed occupation compensation in the cited branch. A draft amount or pending request is not payment proof.
What consent does Vaud require and when?
Article 15 requires concerned owners’ access consent before a subsoil permit/concession; the specified special-method surface branch permits production by access time. Keep the applicable branch explicit.
How does Vaud handle an actual access refusal?
For surface research the department may compel access against equitable applicant-paid compensation. For subsoil research/concession, necessary rights may be acquired through expropriation; neither follows automatically.
What should the final record preserve?
Retain actual plans, consent or authority act, observations, supplied assessment and payment/security evidence. The tool neither values damage nor authorises entry or expropriation.
Frequently asked questions
Which title and works establish the actual scope?
France distinguishes mining operation, authorised exploration and PER work within their rules. Vaud distinguishes surface research from subsoil research or concession; preserve the real route.
Which French land exclusions need checking?
The cited occupation branch excludes land adjoining homes or enclosed by walls/equivalent fences, subject to its reservations. Identify the actual land without treating every parcel as available.
What French compensation evidence precedes occupation?
The beneficiary must have paid or provided security for the assessed occupation compensation in the cited branch. A draft amount or pending request is not payment proof.
What should the final record preserve?
Retain actual plans, consent or authority act, observations, supplied assessment and payment/security evidence. The tool neither values damage nor authorises entry or expropriation.
Sources and versions
- Vaud — Loi sur les ressources naturelles du sous-sol, art. 15
État au 1er avril 2019
- Vaud — Loi sur les ressources naturelles du sous-sol, art. 16
État au 1er avril 2019
- Code minier — article L153-12
Version depuis le 2011-03-01
- Code minier — article L153-3
Version depuis le 2023-07-01
- Code minier — article L153-4
Version depuis le 2011-03-01
- Code minier — article L153-5
Version depuis le 2011-03-01
- Code minier — article L153-6
Version depuis le 2011-03-01