Julie

Votre espace se prépare…

Preparing your space…

Le chargement prend plus de temps que prévu.
Réessayer
Loading is taking longer than expected.
Try again
Skip to main content

Records · procedure · next step

Mineral research rights: prepare the allocation file

A mineral research allocation file links the actual resource and perimeter to a work programme, capacity evidence and the published selection criteria. France’s mineral PER procedure differs from Vaud’s surface-research competition for mineral raw materials. Preserve the application date, notice version, financial commitments and submission receipt. Preparing this record does not establish an award, extend the right to quarry materials or replace separate permissions required before works begin.

General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Julie by AlphaDeep

Illustrative conversation
Example question

Which resource and jurisdiction define the application?

Julie Illustration

France’s statutory mineral list and Vaud’s mineral raw materials under LRNSS article 2(1)(a) define this file. Vaud quarry materials are excluded. Its surface-research competition is not a generic geothermal permission; the existing geothermal owner keeps that project-rights task.

Read the references

Julie currently assists with French law. Which French mineral-research application records would you like to organise?

Law:
France / Switzerland

3 free questions at signup. Avoid names and sensitive information.

Which resource and jurisdiction define the application?

France’s statutory mineral list and Vaud’s mineral raw materials under LRNSS article 2(1)(a) define this file. Vaud quarry materials are excluded. Its surface-research competition is not a generic geothermal permission; the existing geothermal owner keeps that project-rights task.

Which French application date and procedure apply?

Decree 2025-851 excludes applications presented before 1 July 2024 and treats first extensions separately. Keep the actual filing history rather than reuse the repealed 2006 checklist.

Prepare the records

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Use masked references. Nothing is sent before your explicit continuation.

Synthetic example

Resource, notice, programme, capacity, annex, filing and award matrix

Resource
Supplied M1, actual legal category to establish
Perimeter
Map P1 version 2, geological justification missing
Notice
A1 unavailable, actual publication unknown
Programme
Firm F1 and optional conditional C1 separated
Capacity
T1 references, means and third-party support to link
Financing
Supplied budget B1, plan/accounts to attach
Submission
Draft V1, filing receipt missing
Decision
No award or separate works permission assumed

This record organises supplied documents and values; it certifies no entitlement, permission or safety.

What defines the requested perimeter and duration?

France requires a technical justification and maps. Vaud links the right to the named resource, perimeter and detailed programme; neither maximum duration is an award promise.

Which programme and financing records belong together?

For France, link firm and optional conditional phases, minimum expenditure and financing plan. For Vaud, retain the detailed proposed programme and evidence required by the actual competition.

What demonstrates technical and financial capacity?

French articles 5–6 identify qualifications, references, means, third-party commitments and financial documents. Vaud compares programme completeness and technical/financial aptitude under its own provision.

Which notice establishes the actual selection timetable?

French mineral-M competing applications use the JORF branch and forty-five days. Vaud’s notice specifies resource, perimeter, duration and criteria, with at least ninety days for offers.

Which annexes and submission evidence remain missing?

Keep required annexes, versions, sent application and receipt. French environmental/economic/social documents differ from Vaud’s programme, restoration and regulatory annexes. Vaud article 23 also requires a special-method permission request where applicable, including specified ground-contact geophysics. No unverified filing portal or permission is supplied.

What should be checked in the award record?

Link the actual authority act, beneficiary, resource and perimeter. A research-right allocation is not an assumed construction or works permission; preserve conditions and later decisions separately.

Frequently asked questions

Which resource and jurisdiction define the application?

France’s statutory mineral list and Vaud’s mineral raw materials under LRNSS article 2(1)(a) define this file. Vaud quarry materials are excluded. Its surface-research competition is not a generic geothermal permission; the existing geothermal owner keeps that project-rights task.

What defines the requested perimeter and duration?

France requires a technical justification and maps. Vaud links the right to the named resource, perimeter and detailed programme; neither maximum duration is an award promise.

What demonstrates technical and financial capacity?

French articles 5–6 identify qualifications, references, means, third-party commitments and financial documents. Vaud compares programme completeness and technical/financial aptitude under its own provision.

What should be checked in the award record?

Link the actual authority act, beneficiary, resource and perimeter. A research-right allocation is not an assumed construction or works permission; preserve conditions and later decisions separately.

Sources and versions

  1. Vaud — Loi sur les ressources naturelles du sous-sol, art. 2

    État au 1er avril 2019

  2. Vaud — Loi sur les ressources naturelles du sous-sol, art. 21

    État au 1er avril 2019

  3. Vaud — Loi sur les ressources naturelles du sous-sol, art. 22

    État au 1er avril 2019

  4. Vaud — Loi sur les ressources naturelles du sous-sol, art. 23

    État au 1er avril 2019

  5. Décret n° 2025-851 relatif aux titres miniers — article 11

    Version depuis le 2025-08-29

  6. Décret n° 2025-851 relatif aux titres miniers — article 7

    Version depuis le 2025-08-29

  7. Décret n° 2025-851 relatif aux titres miniers — article 6

    Version depuis le 2025-08-29

  8. Décret n° 2025-851 relatif aux titres miniers — article 15

    Version depuis le 2025-08-29

  9. Décret n° 2025-851 relatif aux titres miniers — article 12

    Version depuis le 2025-08-29

  10. Décret n° 2025-851 relatif aux titres miniers — article 5

    Version depuis le 2025-08-29

  11. Décret n° 2025-851 relatif aux titres miniers — article 86

    Version depuis le 2025-08-29

  12. Code minier — article L111-1

    Version depuis le 2022-04-15

  13. Code minier — article L122-1

    Version depuis le 2011-03-01

  14. Code minier — article L162-1

    Version depuis le 2011-03-01