Records · procedure · next step
Childcare institution: prepare opening records
Opening an institutional childcare service requires records for its provider, proposed capacity, leadership, staff and premises. France separates the private-project prior opinion, departmental authorisation and pre-opening file. Switzerland uses its own federal and cantonal framework, with Geneva SASAJ as a named example. This dossier tracks actual applications and decisions without treating prepared records, an assumed silence period or a premises plan as operating approval.
General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Julie by AlphaDeep
Which country and childcare institution are involved? Julie’s legal research currently covers French law.
3 free questions at signup. Avoid names and sensitive information.
| Document question | Reference and records to compare |
|---|---|
France: which activity and prior opinion are distinguished? | L. 2324-1 covers the stated under-six institutions and operations, reserving other regimes. The private-project prior opinion uses the distinct 17579 form under the 31 July 2025 order. |
France: which file requests authorisation? | R. 2324-18 and the order distinguish 17580 authorisation/change branches and their actual attachment columns. Preserve dated missing-piece and completeness correspondence. |
Prepare the records
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Synthetic example
Provider-capacity-personnel and opening-stage record
- Institution
- Synthetic C1; country/category to select
- Capacity
- 20 proposed places; no authorised capacity supplied
- Provider
- S1; identity/prior opinion not checked
- Director
- Masked P1; qualification unassessed
- Staff
- O1 version 1; actual coverage unknown
- Premises
- Plan L1; no conformity determination
- Application
- Draft references; no actual receipt
- Opening
- No operating decision or completed opening file
This record organises supplied documents and values; it certifies no entitlement, permission or safety.
| Document question | Reference and records to compare |
|---|---|
France: which rule governs conditional authorisation? | The current R. 2324-19 controls director/qualification and pre-opening conditions; an older form notice does not override later code wording. No individual implied permission is calculated here. |
France: what belongs to pre-opening preparation? | R. 2324-19 and 17581 separate the pre-opening submission and operation-specific pieces 12–15, including premises-opening evidence and actual staff/contact records. |
Switzerland: which institutional branch is covered? | OPE 13 includes regular day care of several under-twelve children, with express exemptions and permission before admission. It is not the separate holiday-camp task. |
Switzerland: what identifies the application? | OPE 14 distinguishes purpose, legal/financial organisation, number/ages, director/staff and premises; legal-entity statutes and organs are separate evidence. |
Switzerland: what limits the granted permission? | OPE 15–16 concern assessment, responsible director, permitted categories/capacity and conditions. A director change requires the stated new-permission step. |
Geneva: what does the named local route add? | SASAJ describes feasibility, premises/capacity, director and staffing/project review before operating conditions. Actual cantonal requirements and decision remain necessary; French CERFA forms do not apply. |
Frequently asked questions
France: which activity and prior opinion are distinguished?
L. 2324-1 covers the stated under-six institutions and operations, reserving other regimes. The private-project prior opinion uses the distinct 17579 form under the 31 July 2025 order.
France: which rule governs conditional authorisation?
The current R. 2324-19 controls director/qualification and pre-opening conditions; an older form notice does not override later code wording. No individual implied permission is calculated here.
Switzerland: what identifies the application?
OPE 14 distinguishes purpose, legal/financial organisation, number/ages, director/staff and premises; legal-entity statutes and organs are separate evidence.
Geneva: what does the named local route add?
SASAJ describes feasibility, premises/capacity, director and staffing/project review before operating conditions. Actual cantonal requirements and decision remain necessary; French CERFA forms do not apply.