Public-access premises: prepare opening records
Public-premises opening preparation separates the use, supporting works procedures, inspections and actual administrative act. France’s ERP classification and opening route do not create Swiss categories. Geneva provides a named occupancy example with different attestation/permission branches, alongside locally applicable fire references. Prepare actual decisions and their versions without calculating a classification, certifying technical safety or treating an inspection opinion as permission to admit the public.
General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Julie by AlphaDeep
Let’s identify the actual location, use and administrative act. Julie currently handles French law; Swiss preparation remains documentary.
3 free questions at signup. Avoid names and sensitive information.
Which French public and use determine the ERP dossier?
R. 143-2 includes admitted persons beyond staff, not merely paying customers; R. 143-19 classifies by actual type and capacity rules. Record qualified facts rather than an automatic category.
Does French works permission itself establish opening permission?
L. 122-3 and L. 122-5 address separate stages. Keep the actual works title and opening-control/permission evidence; do not infer simplified-route eligibility from area alone.
Prepare the records
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Synthetic example
Public-premises opening-to-decision register
- Premises and country
- Fictitious S1 ; use unestablished
- Classification/capacity
- Not determined
- Works titles
- Incomplete T1
- Controls/attestation
- C1 absent
- Visit/opinion
- V1 absent
- Opening/occupancy act
- No decision supplied
- Notification
- Dates missing
- Exceptions/versions
- To verify
This record organises supplied documents and values; it certifies no entitlement, permission or safety.
What French reopening and inspection evidence should be checked?
R. 143-38 separates the reception visit from the mayor’s opening-permission request, including reopening after over ten months. Its stated exception concerns that request for the specified R. 143-14 establishments without public lodging; it is not a universal exemption from inspection. Preserve the actual category and acts.
Which French act follows the commission’s opinion?
R. 143-39 provides the mayor’s order, notification to operator and copy to the State representative. An opinion and a notified order are different records.
What does Geneva’s named ordinary occupancy branch require?
LCI 7 distinguishes the stated uses with executed plans and qualified conformity attestation. It is Geneva law, not a nationwide Swiss ERP procedure.
Which Geneva version anchors the conformity attestation?
LCI 7 relates it to building permission, conditions and applicable rules when that permission became final. Preserve that actual title/version.
Which Geneva large-public case has its own prior permission?
LCI 7 paragraph 4 requires departmental authorisation for covered new/modified large-public constructions/installations. Do not substitute a French mayor/commission model.
How should Swiss fire references be connected to the project?
AEAI/VKF references use building/use/occupancy criteria and qualified equivalent-concept decisions. Verify cantonal incorporation and actual authority; a checklist grants no departure.
Frequently asked questions
Which French public and use determine the ERP dossier?
R. 143-2 includes admitted persons beyond staff, not merely paying customers; R. 143-19 classifies by actual type and capacity rules. Record qualified facts rather than an automatic category.
What French reopening and inspection evidence should be checked?
R. 143-38 separates the reception visit from the mayor’s opening-permission request, including reopening after over ten months. Its stated exception concerns that request for the specified R. 143-14 establishments without public lodging; it is not a universal exemption from inspection. Preserve the actual category and acts.
Which Geneva version anchors the conformity attestation?
LCI 7 relates it to building permission, conditions and applicable rules when that permission became final. Preserve that actual title/version.
How should Swiss fire references be connected to the project?
AEAI/VKF references use building/use/occupancy criteria and qualified equivalent-concept decisions. Verify cantonal incorporation and actual authority; a checklist grants no departure.