Construction resources: inventory and destination match

A construction resource/waste file links the operation and inventory version to actual removed, reused and delivered quantities with destination evidence. France uses the PEMD diagnostic and post-work reconciliation framework; Switzerland has its own permit-stage waste-plan and requested post-work proof rules. Compare only compatible supplied units. The interface neither adds tonnes to cubic metres nor certifies diagnostic quality, reusable status or lawful disposal.

General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Julie by AlphaDeep

Illustrative conversation
Example question

France: which operations and timing are identified?

Julie Illustration

R.126-8–10 distinguish covered demolition/significant renovation branches and diagnostic timing before specified authorisations or quotes/contracts.

Read the references

Which jurisdiction, material lots and records are involved? Julie’s legal research currently concerns French law.

Law:
France / Switzerland

3 free questions at signup. Avoid names and sensitive information.

Per-lot quantity, unit and destination-evidence reconciliation
Document questionReference and records to compare

France: which operations and timing are identified?

R.126-8–10 distinguish covered demolition/significant renovation branches and diagnostic timing before specified authorisations or quotes/contracts.

Prepare the records

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Referenced lots
Row 1
Example: 1,000.25. Leave unknown values blank or use “?”.
Example: 1,000.25. Leave unknown values blank or use “?”.
Example: 1,000.25. Leave unknown values blank or use “?”.
Example: 1,000.25. Leave unknown values blank or use “?”.
Row 2
Example: 1,000.25. Leave unknown values blank or use “?”.
Example: 1,000.25. Leave unknown values blank or use “?”.
Example: 1,000.25. Leave unknown values blank or use “?”.
Example: 1,000.25. Leave unknown values blank or use “?”.

Use masked references. Nothing is sent before your explicit continuation.

Synthetic example

Per-lot quantity, unit and destination-evidence reconciliation

Supplied lots
2
Per-lot quantity, unit and destination-evidence reconciliation
Masked identifierMaterialUnitInventory versionCompletion-record versionSupplied removed quantitySupplied reused quantitySupplied delivered quantityQuantity still to reconcileStated destinationSupplied receipt or evidence
L1WOOD-AtD1R12.4000000.4000001.9000000.100000SITE-BB1
L2WOOD-Am³D1R13.0000001.000000UnknownUnknownUnknownUnknown
Reconciliation groups
MaterialUnitSupplied planned quantitySupplied removed quantitySupplied reused quantitySupplied delivered quantityQuantity still to reconcile
WOOD-At2.5000002.4000000.4000001.9000000.100000
WOOD-Am³3.0000003.0000001.000000UnknownUnknown

Missing values remain unknown.

This record organises supplied documents and values; it certifies no entitlement, permission or safety.

Per-lot quantity, unit and destination-evidence reconciliation
Document questionReference and records to compare

France: which professional evidence belongs in the file?

Preserve competence, insurance and independence under the cited provisions, together with actual visit coverage and documents used.

France: why retain transmitted diagnostic versions?

R.126-13 addresses delivery to potential designers/contractors before quotes/contracts. A later internal version does not prove what they received.

France: what differs in post-work reconciliation?

R.126-14 addresses actual quantities, destinations and deposit evidence. Keep estimates separate from actual supported movements.

Switzerland: which plan-trigger facts are needed?

OLED 16 uses expected construction-waste volume or hazardous-pollutant conditions. Do not import France’s floor-area trigger or assume every small project is exempt.

Switzerland: what belongs in the permit-stage record?

The commissioning owner supplies waste type, quality, quantity and intended disposal routes in the covered permit application.

Switzerland: how is separation documented?

Article 17 separates special waste and specified other streams, with suitable-facility sorting if on-site separation is impracticable and possible further authority requirements.

Switzerland: when is actual disposal proof supplied?

Where the article 16 plan exists, the authority can request post-work proof of disposal following its instructions. An arithmetic remainder alone does not establish that proof.

Frequently asked questions

France: which operations and timing are identified?

R.126-8–10 distinguish covered demolition/significant renovation branches and diagnostic timing before specified authorisations or quotes/contracts.

France: why retain transmitted diagnostic versions?

R.126-13 addresses delivery to potential designers/contractors before quotes/contracts. A later internal version does not prove what they received.

Switzerland: what belongs in the permit-stage record?

The commissioning owner supplies waste type, quality, quantity and intended disposal routes in the covered permit application.

Switzerland: when is actual disposal proof supplied?

Where the article 16 plan exists, the authority can request post-work proof of disposal following its instructions. An arithmetic remainder alone does not establish that proof.

Sources and versions

  1. ch-oled-fr

    2026-08-01

  2. fr-cch-L126-34
  3. fr-cch-R126-10
  4. fr-cch-R126-11
  5. fr-cch-R126-12
  6. fr-cch-R126-13
  7. fr-cch-R126-14
  8. fr-cch-R126-8
  9. fr-cch-R126-9