Renewable support: prepare the application file

A renewable-support application identifies the named programme, version, project and actual filing period. France’s example is CREPPE 2 onshorewind P13, October 2026 specification; Switzerland’s example is the wind project-study contribution. These have different applicants, annexes, authorities and award stages. Preserve actual filing and decision evidence without treating a published specification or receipt as acceptance, tariff entitlement or permission to start works.

General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Julie by AlphaDeep

Illustrative conversation
Example question

France: which call version and window are identified?

Julie Illustration

PPE 2 onshorewind P13 uses the October 2026 specification and 7–17 December 2026,23:59 window. Publication on the checked 6 November does not mean filing is open; later amendments need review.

Read the references

Which jurisdiction and named support programme are involved? Julie’s legal research currently concerns French law.

Law:
France / Switzerland

3 free questions at signup. Avoid names and sensitive information.

France: which call version and window are identified?

PPE 2 onshorewind P13 uses the October 2026 specification and 7–17 December 2026,23:59 window. Publication on the checked 6 November does not mean filing is open; later amendments need review.

France: how are offers and candidate records separated?

Section 3 distinguishes one installation per offer, separate period files, legal identity, signatory authority and required financial/environmental records.

Prepare the records

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Use masked references. Nothing is sent before your explicit continuation.

Synthetic example

Programme-project-annex and actual-award-stage matrix

Programme
Named jurisdiction/instrument; synthetic WIND1
Applicant
C1; actual signatory authority missing
Project
I1; perimeter and planning basis unverified
Annexes
D1; statutory list not yet matched
Financial records
F1; supplied figures/eligibility unassessed
Filing
No actual submission or receipt
Decision
No principle/final award supplied

This record organises supplied documents and values; it certifies no entitlement, permission or safety.

France: what makes a business plan consistent?

The prescribed spreadsheet and candidature form must align. Mandatory fields, format and readability are distinct from an assessment that the project is financially sound.

France: does filing receipt establish selection?

No. The specification separates CREinstruction, elimination/ranking and ministerial designation; other permissions and network conditions remain separate.

Switzerland: which wind-support instrument is addressed?

The named project-study contribution uses OEneRannex 2.4 section 3 and the federal energy office. It is not the investment-contribution application in section 4.

Switzerland: which project annexes must be matched?

The statutory list addresses cantonal planning basis, preliminary study, perimeter/sites, project/study/planning timetable and responsible contact. A subset checkbox list does not remove statutory contents.

Switzerland: which signature and transmission evidence is retained?

The live native form directs complete signed application/annexes electronically, with the original additionally posted if signed by hand. Preserve actual version and receipts.

Switzerland: why separate principle commitment and final amount?

35g makes principle commitment conditional on examination/funds;35k uses remaining conditions and actual costs for final fixing. Submission does not calculate an entitlement.

Frequently asked questions

France: which call version and window are identified?

PPE 2 onshorewind P13 uses the October 2026 specification and 7–17 December 2026,23:59 window. Publication on the checked 6 November does not mean filing is open; later amendments need review.

France: what makes a business plan consistent?

The prescribed spreadsheet and candidature form must align. Mandatory fields, format and readability are distinct from an assessment that the project is financially sound.

Switzerland: which project annexes must be matched?

The statutory list addresses cantonal planning basis, preliminary study, perimeter/sites, project/study/planning timetable and responsible contact. A subset checkbox list does not remove statutory contents.

Switzerland: why separate principle commitment and final amount?

35g makes principle commitment conditional on examination/funds;35k uses remaining conditions and actual costs for final fixing. Submission does not calculate an entitlement.

Sources and versions

  1. ch-oener-fr

    2026-07-01

  2. ch-wind-application-fr
  3. ch-wind-guide-fr
  4. fr-cre-p13-cdc
  5. fr-cre-p13-page