A solar project needs separate checks for grid connection, export arrangements and payment for electricity. An installation quotation does not settle every network or supply condition. France and Switzerland use different contracts and regulatory frameworks. The timeline links applications, operator replies and commitments without guaranteeing a connection date or importing an outdated electricity-remuneration formula into a current project.

Text in force1 July 2021Sources checked1 November 2026

  • Official texts cited
  • Sources checked on
  • Drafted with AI assistance, our method

General legal information with official references and dated checks. It is not personalised advice: for a decision that commits you, have your situation checked by a qualified professional.

Julie by AlphaDeep

Illustrative conversation
Example question

What is consumed locally or exported?

Julie Illustration

France's L315-1 defines self-consumption within its scope. Separate energy used on site from electricity supplied to the grid.

Read the references

Your question concerns “Solar grid connection: export and contract records”. I can help organise the facts and records. Which document have you received or prepared, and is this a French or Swiss matter?

French law

3 free questions at signup. Avoid names and sensitive information.

Answer

Which site produces which electricity?

Describe installation, producer and intended use. This concerns grid and energy arrangements, not cancellation of a panel-sales contract.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

Answer

What is consumed locally or exported?

France's L315-1 defines self-consumption within its scope. Separate energy used on site from electricity supplied to the grid.

Tool

Which records are still missing from your file?

Indicate which records you have. The result identifies gaps and prepares a complete question for Julie, without requiring an account.

julie://tool/echeancierNothing leaves your browser

Answers stay on this page until you explicitly continue to Julie. Avoid names and sensitive information.

Fictional example · Your preparation

Point to complete: Buyer and remuneration. French L314-1 has conditional purchase provisions. Swiss LEne 15 has its own uptake and remuneration limits. Neither is a universal return guarantee.

Production and site
Record available
Self-consumption and export
Record available
Connection and metering
Record available
Buyer and remuneration
Needs checking
Records indicated
3 / 4
  1. Which buyer and remuneration are documented?

This worksheet organises records; it does not establish admissibility, entitlement or a procedural outcome.

Answer

Which connection and metering records exist?

French L342-1 concerns connection works. A purchase agreement alone does not establish completed grid connection.

Answer

Which buyer and remuneration are documented?

French L314-1 has conditional purchase provisions. Swiss LEne 15 has its own uptake and remuneration limits. Neither is a universal return guarantee.

Answer

What current Swiss fallback matters?

Where price is not agreed, current LEne 15 uses a quarterly-average market framework in its scope. The older FAQ cost explanation is not substituted for current law.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

Comparison

Which documents answer which questions?

Which documents answer which questions?
Record or informationIssue to check
Production and siteDescribe installation, producer and intended use. This concerns grid and energy arrangements, not cancellation of a panel-sales contract.
Self-consumption and exportFrance's L315-1 defines self-consumption within its scope. Separate energy used on site from electricity supplied to the grid.
Connection and meteringFrench L342-1 concerns connection works. A purchase agreement alone does not establish completed grid connection.
Buyer and remunerationFrench L314-1 has conditional purchase provisions. Swiss LEne 15 has its own uptake and remuneration limits. Neither is a universal return guarantee.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

Answer

Does the worksheet supply a solar tariff?

No rate, minimum currency amount or return is invented. Verify actual agreement, period and applicable mechanism.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

The law

Which official provision helps explain this situation?

Une opération d'autoconsommation individuelle est le fait pour un producteur, dit autoproducteur, de consommer lui-même et sur un même site tout ou partie de l'électricité produite par son installation. La part de l'électricité produite qui est consommée l'est soit instantanément, soit après une période de stockage.

Code de l’énergie art.L315-1In force since 1 July 2021Read on Légifrance

In plain English: Where price is not agreed, current LEne 15 uses a quarterly-average market framework in its scope. The older FAQ cost explanation is not substituted for current law.

Answer

What belongs before commissioning?

Gather application, network agreement, metering, acceptance and energy-purchase contract. An installer's promise does not replace each agreement.

Answer

What does the solar grid prepare?

It organises production, flows, network and sale. It performs no connection and calculates no guaranteed profitability.

Frequent questions

What other questions arise in this file?

What is consumed locally or exported?

France's L315-1 defines self-consumption within its scope. Separate energy used on site from electricity supplied to the grid.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

Which buyer and remuneration are documented?

French L314-1 has conditional purchase provisions. Swiss LEne 15 has its own uptake and remuneration limits. Neither is a universal return guarantee.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

What current Swiss fallback matters?

Where price is not agreed, current LEne 15 uses a quarterly-average market framework in its scope. The older FAQ cost explanation is not substituted for current law.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

What belongs before commissioning?

Gather application, network agreement, metering, acceptance and energy-purchase contract. An installer's promise does not replace each agreement.

Code de l’énergie art.L315-1Code de l’énergie art.L314-1Code de l’énergie art.L342-1730.0 : Art. 15 Obligation de reprise et de rétribution730.0 : Art. 16 Consommation propre

Sources

Which official references should you consult?

  1. Code de l’énergie art.L315-1Légifrance
  2. Code de l’énergie art.L314-1Légifrance
  3. Code de l’énergie art.L342-1Légifrance
  4. 730.0 : Art. 15 Obligation de reprise et de rétributionFedlex
  5. 730.0 : Art. 16 Consommation propreFedlex

Texts cited last checked: 1 November 2026