Julie

Votre espace se prépare…

Preparing your space…

Le chargement prend plus de temps que prévu.
Réessayer
Loading is taking longer than expected.
Try again
Skip to main content

Records · procedure · next step

Market consultation: 5 pre-tender evidence priorities

A pre-tender market-consultation file connects the actual project and mandate with contacted operators, comparable questions, dated findings and intended use. Track possible information advantage and the measures actually implemented before launch. French preparation rules and Swiss federal prior-involvement provisions differ. This guide ranks evidence dependencies without selecting a supplier, certifying neutrality, automatically excluding a participant or granting blanket immunity to anyone involved in preparation.

General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Julie by AlphaDeep

Illustrative conversation
Example question

Which project and mandate define the preliminary exchanges?

Julie Illustration

France permits market consultations/studies and advice before procurement. Swiss federal law specifically addresses a purchaser-requested pre-tender market study; preserve actual scope rather than relabel later bid negotiation as research.

Read the references

Julie currently assists with French law. Which French pre-tender contacts and preparation records would you like to organise?

Law:
France / Switzerland

3 free questions at signup. Avoid names and sensitive information.

Which project and mandate define the preliminary exchanges?

France permits market consultations/studies and advice before procurement. Swiss federal law specifically addresses a purchaser-requested pre-tender market study; preserve actual scope rather than relabel later bid negotiation as research.

Preparation priority

Traceability before launch: define need, trace information and uses, then document the actual advantage assessment and implemented measures.

  1. Fix the preparation scope

    Separate market study from offer evaluation.

  2. Trace contacts and questions

    Keep dates, roles and comparable versions.

  3. Link findings to intended use

    Connect each proposed requirement to provenance.

  4. Examine information advantage

    Document participation and unequal information.

  5. Evidence the measures

    Separate planned action from actual dissemination.

Prepare the records

Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.

Use masked references. Nothing is sent before your explicit continuation.

Synthetic example

Project, contact, question, information, use, advantage and action-evidence register

Project
M1, need B1 before launch
Preparation mandate
Study E1, author/scope to document
Contacts
Masked operators O1/O2, dates in J1
Questions
Q1; actual version sent to O2 to check
Findings
Responses R1/R2; unattributed datum remains flagged
Intended use
Requirement K1 linked to market finding
Possible advantage
I1 shared only with O1; assessment incomplete
Measures
C1 planned; dissemination and effect evidence missing

This record organises supplied documents and values; it certifies no entitlement, permission or safety.

Which operators and information exchanges are evidenced?

Record masked operator roles, dates and actual content. A supplier list alone does not establish comparable access or show which participant received preparation information unavailable to others.

What comparable questions and responses were used?

Keep questionnaire versions, responses and limitations. Link each finding to provenance; an unattributed market summary cannot establish what was shared or its use in the future specifications.

How will the findings affect the tender?

France conditions their use on competition/procurement principles. Switzerland’s commissioned-study branch requires publication of its results in tender documents; do not equate a private summary with that publication.

Which actual information advantage needs examination?

Connect prior preparation and unavailable information to the supplied assessment. French remedial measures and Swiss uncompensable-advantage/effective-competition conditions are separate, not automatic exclusion or universal immunity.

What measures and completed dissemination are documented?

Record actual action and evidence. Swiss examples include preliminary-work information, participant names and extended minimum periods; they are not a universal French checklist or proof that any advantage has been neutralised.

What impartiality records belong to the responsible roles?

Swiss federal personnel/commissioned-party duties include relevant outside interests and an impartiality declaration. Keep the actual record and role; this does not replace the separate information-advantage assessment.

What supports the transition to tender launch?

Preserve mandate, contacts, findings, intended use, publication and measures. The tool neither sends operator messages nor determines procurement validity from contact count; draft and completed actions remain separate.

Frequently asked questions

Which project and mandate define the preliminary exchanges?

France permits market consultations/studies and advice before procurement. Swiss federal law specifically addresses a purchaser-requested pre-tender market study; preserve actual scope rather than relabel later bid negotiation as research.

What comparable questions and responses were used?

Keep questionnaire versions, responses and limitations. Link each finding to provenance; an unattributed market summary cannot establish what was shared or its use in the future specifications.

Which actual information advantage needs examination?

Connect prior preparation and unavailable information to the supplied assessment. French remedial measures and Swiss uncompensable-advantage/effective-competition conditions are separate, not automatic exclusion or universal immunity.

What supports the transition to tender launch?

Preserve mandate, contacts, findings, intended use, publication and measures. The tool neither sends operator messages nor determines procurement validity from contact count; draft and completed actions remain separate.

Sources and versions

  1. Code de la commande publique — article R2111-1

    Version depuis le 2019-04-01

  2. Code de la commande publique — article R2111-2

    Version depuis le 2019-04-01

  3. Loi fédérale sur les marchés publics

    État au 1er janvier 2026

  4. Ordonnance sur les marchés publics

    État au 1er septembre 2023