Campsite preparation connects the actual parcel, capacity, accommodation, operator and proposed works. France’s development-permit/declaration branches differ from Swiss land-use and named Geneva operating rules. Keep landowner consent, public permissions and classification separate. The dossier does not certify installations, choose a complete route from one headcount or assume private/member-only land is exempt. Actual canton, commune and project evidence remain necessary.
General information and document preparation. The facts, actual procedural acts and applicable versions must be checked.
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Julie by AlphaDeep
Let’s identify the actual site and operator records. Julie currently handles French law; Swiss preparation remains documentary.
3 free questions at signup. Avoid names and sensitive information.
Which French capacity and works evidence determines the planning branch ?
R. 421-19 covers the specified persons/accommodation thresholds and other development branches. Keep the entire actual programme.
When might the French prior-declaration branch be relevant ?
R. 421-23 concerns habitual camping provision/development outside the stated permit branch under its conditions. No automatic exemption is generated.
Prepare the records
Julie’s legal research currently covers French law. The Swiss sections prepare documents; they do not establish Swiss-law product capability.
Synthetic example
Parcel-capacity-works operation-permission dossier
- Land/use title
- Fictitious P1 ; absent
- Capacity/accommodation
- C1 incomplete
- Works/plans
- A1 absent
- Permit/declaration
- No act received
- Rules/operation
- R1 missing
- Classification/other records
- Undocumented
This record organises supplied documents and values; it certifies no entitlement, permission or safety.
Does French landowner consent settle local restrictions ?
R. 111-32 preserves prohibited-area/local limits. Keep use title and applicable restrictions separately.
Can French campsite classification replace development/operation requirements ?
R. 111-35 retains planning, landscape, equipment and operating standards. A label does not itself document those permissions.
What Swiss land-use authority and parcel need identification ?
LAT/RPG/LPT 22 concerns competent construction permission and zoning/servicing conditions. The tool neither approves the parcel nor designs servicing.
Which Geneva campsite scope and exception are described ?
RCamp 2–3 concern equipped public/member sites and specified exclusions, including occasional camps up to twenty-one days. This is Geneva, not a national threshold.
Who operates and supplies Geneva’s internal rules ?
RCamp 4 identifies responsible operator or default owner; 5–6 concern approved/displayed rules and stated installations duties. Preserve actual acts.
Does Swiss private consent or a label replace those records ?
No such replacement is established by LAT 22/RCamp. Keep actual operator notice, site permission and rules rather than presuming a complete approval.
Frequently asked questions
Which French capacity and works evidence determines the planning branch ?
R. 421-19 covers the specified persons/accommodation thresholds and other development branches. Keep the entire actual programme.
Does French landowner consent settle local restrictions ?
R. 111-32 preserves prohibited-area/local limits. Keep use title and applicable restrictions separately.
Which Geneva campsite scope and exception are described ?
RCamp 2–3 concern equipped public/member sites and specified exclusions, including occasional camps up to twenty-one days. This is Geneva, not a national threshold.
Does Swiss private consent or a label replace those records ?
No such replacement is established by LAT 22/RCamp. Keep actual operator notice, site permission and rules rather than presuming a complete approval.