Access to an existing duct requires an identified infrastructure, a responsible controller and a specific legal basis. Assemble capacity evidence, technical constraints, proposed charges and negotiation records. France’s applicable European and national framework must be distinguished from Switzerland’s particular access routes. Neither a capacity estimate nor a duct-access agreement grants the separate permission needed to excavate or carry out works on a public road.

Julie by AlphaDeep is an AI legal assistant for French law: it researches official references to help answer your questions (Légifrance, case law, service-public), analyses your documents and drafts your letters, for individuals and professionals alike.

Sources checked3 November 2026

  • Official texts cited
  • Sources checked on
  • Drafted with AI assistance, our method

General legal information with official references and dated checks. It is not personalised advice: for a decision that commits you, have your situation checked by a qualified professional.

Julie by AlphaDeep

Illustrative conversation
Example question

Who controls it and what national access basis is invoked?

Julie Illustration

France: connect the controlling body with the national and European basis applicable to the dated request. Switzerland: distinguish dominant-supplier duct access under LTC 11 from the separate co-use route under LTC 36; ownership alone does not determine either outcome.

Read the references

Your file concerns “Existing telecom ducts: prepare an access request”. Does it concern France or Switzerland? Share the document for infrastructure and controller and the decision you need to prepare.

French law

3 free questions at signup. Avoid names and sensitive information.

Answer

Which existing infrastructure and section are requested?

France: identify the existing duct, section and deployment timetable under the actual request. Switzerland: identify the concrete installation and capacity sought; this task concerns existing infrastructure, separate from permission to excavate a new route.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Answer

Who controls it and what national access basis is invoked?

France: connect the controlling body with the national and European basis applicable to the dated request. Switzerland: distinguish dominant-supplier duct access under LTC 11 from the separate co-use route under LTC 36; ownership alone does not determine either outcome.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Tool

Existing-infrastructure capacity and access dossier

Synthetic example: fictional records. Existing-infrastructure capacity and access dossier.

julie://tool/echeancierNothing leaves your browser

Answers stay on this page until you explicitly continue to Julie. Avoid names and sensitive information.

Synthetic example: fictional records · Existing-infrastructure capacity and access dossier

Jurisdiction
France
Infrastructure and controller
Duct C1, controller G1
Requested capacity
Section T1, plan P1
Proposed conditions
Charge F1, maintenance M1
Requests and responses
Dated request D1, response R1

Neither a capacity estimate nor a duct-access agreement grants the separate permission needed to excavate or carry out works on a public road.

Answer

What plans or surveys support the available capacity?

France: preserve dated plans and capacity surveys, separating measurements from assumptions. Switzerland: OST 52 addresses inspection and capacity justification in its scope; this worksheet does not certify sufficient physical space for the proposed cables.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Comparison

Preparation reference: Existing-infrastructure capacity and access dossier

Existing-infrastructure capacity and access dossier
Preparation questionPoint to verify
Which existing infrastructure and section are requested?France: identify the existing duct, section and deployment timetable under the actual request. Switzerland: identify the concrete installation and capacity sought; this task concerns existing infrastructure, separate from permission to excavate a new route.
Who controls it and what national access basis is invoked?France: connect the controlling body with the national and European basis applicable to the dated request. Switzerland: distinguish dominant-supplier duct access under LTC 11 from the separate co-use route under LTC 36; ownership alone does not determine either outcome.
What plans or surveys support the available capacity?France: preserve dated plans and capacity surveys, separating measurements from assumptions. Switzerland: OST 52 addresses inspection and capacity justification in its scope; this worksheet does not certify sufficient physical space for the proposed cables.
Which refusal reasons and alternative arrangements are documented?France: compare the actual refusal grounds and alternatives with the requested section. Switzerland: retain any written insufficient-capacity justification and alternative arrangement; an unsupported statement is not a verified survey, and an alternative offer is not an accepted agreement.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Answer

Which refusal reasons and alternative arrangements are documented?

France: compare the actual refusal grounds and alternatives with the requested section. Switzerland: retain any written insufficient-capacity justification and alternative arrangement; an unsupported statement is not a verified survey, and an alternative offer is not an accepted agreement.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

The law

Which official provision helps explain this situation?

Code des postes et des communications électroniques : L34-8-2-1, L47Sources checked 3 November 2026See the texts cited

Access to an existing duct requires an identified infrastructure, a responsible controller and a specific legal basis. Assemble capacity evidence, technical constraints, proposed charges and negotiation records. France’s applicable European and national framework must be distinguished from Switzerland’s particular access routes. Neither a capacity estimate nor a duct-access agreement grants the separate permission needed to excavate or carry out works on a public road.

Answer

How are maintenance, security and damage duties allocated?

France: compare proposed maintenance, intervention security, damage and future-access duties. Switzerland: preserve the corresponding allocation under the actual access or co-use arrangement; a price alone does not describe those operational obligations.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Answer

What price and technical access conditions have been proposed?

France: connect offered price, duration and technical conditions with the defined section. Switzerland: distinguish the relevant compensation framework and actual terms; the tool supplies neither a universal duct-access price nor a finding that an agreement is complete.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Answer

What negotiation records and date-specific rules belong in the dossier?

France: retain dated requests and negotiations and check the applicable national/EU interaction instead of applying an old template deadline. Switzerland: identify which statutory access branch and authority route the actual correspondence invokes, without merging them into one procedure.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Answer

Which roadwork permission remains separate from access to the duct?

France: L47 road occupation permission remains separate from using a duct. Switzerland: public-land and roadwork conditions remain distinct as well; an infrastructure agreement does not by itself authorise every excavation, traffic measure or restoration operation.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Frequent questions

What other questions arise in this file?

Who controls it and what national access basis is invoked?

France: connect the controlling body with the national and European basis applicable to the dated request. Switzerland: distinguish dominant-supplier duct access under LTC 11 from the separate co-use route under LTC 36; ownership alone does not determine either outcome.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Which refusal reasons and alternative arrangements are documented?

France: compare the actual refusal grounds and alternatives with the requested section. Switzerland: retain any written insufficient-capacity justification and alternative arrangement; an unsupported statement is not a verified survey, and an alternative offer is not an accepted agreement.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

What price and technical access conditions have been proposed?

France: connect offered price, duration and technical conditions with the defined section. Switzerland: distinguish the relevant compensation framework and actual terms; the tool supplies neither a universal duct-access price nor a finding that an agreement is complete.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Which roadwork permission remains separate from access to the duct?

France: L47 road occupation permission remains separate from using a duct. Switzerland: public-land and roadwork conditions remain distinct as well; an infrastructure agreement does not by itself authorise every excavation, traffic measure or restoration operation.

Code des postes et des communications électroniques : L34-8-2-1, L47Loi sur les télécommunications : 11, 36, 35Ordonnance sur les services de télécommunication : 52, 63

Sources

Which official references should you consult?

  1. Code des postes et des communications électroniques : L34-8-2-1, L47www.legifrance.gouv.fr
  2. Loi sur les télécommunications : 11, 36, 35www.fedlex.admin.ch
  3. Ordonnance sur les services de télécommunication : 52, 63www.fedlex.admin.ch

Texts cited last checked: 3 November 2026